Market · Public Works
Seal and stabilize the Public Works infrastructure your community runs on: from treatment plants and sewers to settling roads, all of it trenchless, with no excavation.
Treatment tanks, sewer mains, manholes, and lift stations leak; storm drains undermine pavement; bridge approaches and your own slabs and buildings settle. Polyurethane injection seals leaks and fills voids, curtain grouting cuts off groundwater around structures, and Deep Lock® deep injection stabilizes the soil beneath roads and foundations. Every method is trenchless, worked through small injection ports instead of open-cut trenches, so there is no excavation, and in many cases the system stays in service while the work is done.
Water & wastewater treatment
Sewers, manholes & lift stations
Roads & storm drainage
Trenchless · no excavation
Bigger than the visible symptom
A wet manhole or a sunken road is usually a sign of something moving underground.
Water standing in a treatment structure, groundwater seeping into a manhole, a roadway dipping over a storm drain, the puddle, the crack, or the pothole is the symptom. What is usually failing below is a cracked wall or joint, a pipe penetration that has opened up, or soil that has washed out and left a void.
Reaching that cause is what separates a repair that holds from one that returns. Patching the surface or relining a single joint without addressing the groundwater or the soil tends to move the problem a few feet down the line rather than resolve it.
Where this applies
If it carries water, supports a road, or sits on fill, it can usually be sealed, stabilized, or lifted in place.
These are the Public Works conditions seen most often, led by the ones that carry the highest consequence. Start with what you are seeing and follow it into the matching condition page.
Water & wastewater
Treatment tanks & basins
Concrete tanks and basins at drinking-water and sewage treatment plants that leak through walls, joints, and pipe penetrations.
Collection system
Sewers, manholes & lift stations
Gravity sewer pipes, manholes, and lift stations where groundwater leaks in and the surrounding soil washes out and settles.
Roads & drainage
Roads & storm drainage
Storm-drain leaks that undermine pavement, and roadways settling over voids or weak subgrade. (State highways and transit corridors route to the Transportation page.)
Bridges
Bridge approach slabs
Approach slabs that have settled at the bridge joint, where the backfill they sit on has consolidated or washed out.
Other public assets
Buildings, parking & retention
Your own buildings, parking lots, and retention ponds, settling foundations and slabs, and ponds that leak or will not hold water.
Not sure where the failure is starting?
Describe the condition, the leak, the settlement, the repair that keeps coming back, and get a defensible repair direction before the project moves further.
Stronger early decisions reduce disruption
Caught early, most Public Works conditions can be repaired in place, and kept in service.
Polyurethane injection is targeted and sets in minutes, and the method is trenchless, applied through small injection ports rather than open-cut trenches. Most leaks and voids are sealed and filled with no excavation, without rerouting flow, and in many cases without taking a tank, line, or lane out of service; the work is staged at the structure or the curb rather than across the whole site.
That matters more every year. As corridors grow denser, open-cut trenching means closed roads, exposed crews, and utilities packed into tight ground, the disruption, safety exposure, and access problems a trenchless repair is built to avoid.
Left alone, a leaking collection system gets more expensive in ways that compound. Groundwater that enters through failed joints, inflow and infiltration, is water the system was never meant to carry: it is pumped and treated, it adds wear to lift stations, and it consumes plant capacity that would otherwise serve growth. Past a point, the response becomes a larger pump, an expanded plant, or a new one.
When the condition runs deeper than it looks
Sealing the leak is not always the whole fix, sometimes the ground has to be addressed too.
Many Public Works repairs stop at the visible defect: seal the joint, patch the slab. That is the right call when the only problem is at the surface. But a leaking lift station or a settling road often has a deeper cause, soil washed out or weakened several feet down, and sealing the surface alone leaves the ground free to keep moving, so the defect returns.
This is where soil testing pays off. A dynamic cone penetrometer (DCP) test measures how strong the ground is at depth, so a weak layer below a structure or roadway shows up instead of being missed. When a repair is being scoped, it is worth confirming whether a DCP test was run before the work is quoted.
When the test shows the cause is deeper, the repair goes deeper: Deep Lock® deep injection strengthens the weak zone and carries support down to it. When the test shows it is a shallow void or a leaking joint, sealing or a straightforward lift is all it needs. Once the direction is clear, the right material and system are matched on the Systems & Products page.
Seal
Seal leaks & cut off groundwater
Stop water entering tanks, sewers, manholes, and lift stations, and curtain-grout to block groundwater around structures.
Stabilize
Stabilize settling ground
Strengthen weak or washed-out soil beneath roads, structures, and foundations with Deep Lock® deep injection.
Lift
Lift settled slabs & pavement
Raise settled roadways, sidewalks, parking, and bridge approach slabs back toward grade.
Public Works: common questions
Often, yes. Polyurethane injection seals active leaks in concrete tanks and basins by filling the cracks, joints, and penetrations where water is moving, frequently while the structure stays in service. Whether a given tank qualifies depends on its condition and where the water is entering, which a project review confirms.
Two things working together. Groundwater finds failed joints, cracks, and pipe penetrations and leaks in, this is inflow and infiltration, and that same moving water washes out the surrounding soil, which lets the structure settle. Sealing the structure stops the water, and stabilizing the soil around it addresses the settlement, so both halves of the problem are handled rather than one.
Groundwater that leaks into a collection system is water the plant was never meant to handle: it gets pumped, treated, and counted against capacity, and it adds wear to lift stations along the way. Sealing the entry points at the source reduces that extra volume, which eases the load on pumps and the plant. The size of the saving depends on the system and how much infiltration is occurring.
Often. Deep Lock® deep injection strengthens the weak soil beneath the pavement, and where the slab is sound, injection can raise settled sections back toward grade, so the road is addressed in place rather than excavated and rebuilt. A soil test at depth shows whether the cause is shallow or deep, which sets the right approach.
Usually, when the slab is sound but settled. Approach slabs settle because the backfill beneath them consolidates or washes out at the joint. Deep injection stabilizes that backfill and slab lifting raises the approach back toward grade, a deep-and-lift approach that addresses both the soil and the surface, rather than replacing the slab and leaving the same fill underneath.
Yes. The polyurethane used for leak sealing is formulated to react in the presence of water, which is exactly why it suits active leaks, saturated soil, and structures below the water table. That moisture tolerance is what allows tanks, manholes, and lift stations to be sealed while water is still present.
It depends on who owns the asset. Municipal streets, storm drainage, treatment plants, and your own facilities typically fall to Public Works, while state highways, interstates, and rail or transit corridors usually sit with a state or local department of transportation. The methods are the same on both sides; the Transportation page covers the DOT and multimodal assets.
Those are in scope too. Settling foundations and slabs at your own facilities are stabilized and lifted the same way as any structure on weak soil, settled and cracked parking lots are lifted back toward grade, and retention ponds that leak or will not hold are sealed. It is the same seal, stabilize, and lift logic applied to the assets you own and maintain.
Yes. Every method here is trenchless: the repair is made through small injection ports rather than an open-cut trench, so there is no excavation to seal a tank, sewer, manhole, or lift station, or to stabilize and lift settling pavement. Trenchless work avoids the road closures, safety exposure, and tight-quarters access problems of open-cut digging, which is why it suits dense and busy public rights-of-way.
Generally low. The work is trenchless, done through small injection ports with equipment staged at the curb or the structure, so it avoids the open-cut excavation and the long lane or service closures that come with digging. Many repairs are completed in a single visit, which keeps the system in use and limits the impact on the public.
Proof & Verification
Named Project
Preventing Undermining, US-98 Stormwater Repair
Performance Data Point
Highway stayed open throughout the repair.
Documentation Reference
Public Works conditions do not resolve on their own, but caught early, most leaks, voids, and settling ground can be sealed, stabilized, and lifted in place: trenchless, with no excavation, and in many cases without pulling a system offline. Tell us what is happening on the system and get a defensible repair plan.