Concrete Leveling & Stabilization · Structural Foam

AP Lift 440 Structural Polyurethane Foam

The 4 lb grade of the AP Lift line, at 80 psi free-rise compressive strength against 50 for the 3 lb foams. Specified where the slab carries traffic rather than footsteps, and where the ground under it has to be firmed up at the same time.

NSF/ANSI/CAN 61 & 372 Certified · Certified for contact with drinking water. The listing carries use restrictions.

DOT & highway

Slab lifting & leveling

Void & annular space fill

Soil densification

What it is

The 4 lb grade, for slabs that carry traffic

AP Lift 440 is a two component structural polyurethane foam used to raise concrete slabs, fill the voids and annular spaces beneath them, and densify the weak ground that let them settle. It is a 4 lb foam, meaning a nominal cured density of 4 pounds per cubic foot. That density is the whole basis on which these products are selected: a 4 lb foam carries more load than a 3 lb foam and less than a 6 lb foam, and the grades are not interchangeable.

In practice that puts 440 on roadways, ramps, approach slabs, warehouse and industrial floors, and anywhere a wheel load rather than a footstep decides the design. It is also hydro insensitive, which means water in the ground does not stop the reaction. The two sides are heated, metered, and mixed at the gun, then injected through small ports drilled in the slab.

Where it is used

What AP Lift 440 is used for

AP Lift 440 sits in the Concrete Leveling and Stabilization solution family, and is also used for soil stabilization work where the ground itself is the problem, including deep injection through tubes under the Deep Lock® process. The data sheet lists these uses:

  • Stabilizing soil

  • Lifting concrete slabs

  • Filling voids and annular spaces

  • Supplemental sinkhole remediation

Not sure whether the slab or the ground is the real problem? Start with settled concrete slabs if the concrete has dropped but the ground below is still solid, or soil instability beneath structures if the ground itself is weak or still moving. If the settlement is at a bridge approach, start with bridge approach settlement.

How it works

How AP Lift 440 raises a loaded slab in controlled increments

Small ports are drilled through the slab, the two components are heated and mixed at the gun, and the foam is injected beneath the concrete, where it expands in seconds, fills the void, compresses the surrounding soil, and then lifts the slab. Because the reaction is measured in seconds rather than minutes, a crew injects in short bursts and watches the slab move, rather than committing a large volume and hoping.

The heavier grade changes two things a crew feels on site. The foam expands 18 times rather than 25, so the same void takes more material and quantities have to be planned from the 4 lb figures rather than the 3 lb ones. And it works on a slightly longer clock, tack free in 22 seconds against 17 for AP Lift 430, which gives more working time under a large slab.

Cure follows almost immediately. The data sheet publishes 90 percent of full strength in about 15 minutes, which is why slab lifting is typically a same-day return to service instead of a multi-day closure. On a road or a ramp that is usually the deciding factor. Confirm return to service for your loading and site conditions before scheduling traffic.

Technical specifications

Published properties


Cured foam, free rise

Property

Value

Method

Density, free rise

4 lb foam. Nominal 4 lb/ft³, range 3.75 to 4.25 lb/ft³ (60 to 68 kg/m³)

ASTM D1622

Compressive strength, free rise

80 psi, or 11,500 psf (552 kPa)

ASTM D1621 / D1622

Tensile strength, free rise

90 psi, or 13,000 psf (621 kPa)

ASTM D638

Shear strength, free rise

40 psi, or 5,760 psf (276 kPa)

ASTM C273

Flexural strength

130 psi, or 18,700 psf (896 kPa)

ASTM D790

Closed cell content

85.2%

ASTM D6226

Shrinkage

Negligible

ASTM D1042 / D756

Expansion, unconfined

18 times liquid volume

TDS

Strength development

90% of full strength in about 15 minutes

TDS

NY-Panel result

Pass, 92.4% density retention

TDS




Cured foam, confined

Property

1.5x

2x

3x

Compressive strength, confined

165.3 psi, 23,800 psf

193.2 psi, 27,800 psf

216.1 psi, 31,100 psf

Shear strength, confined

82.6 psi, 11,900 psf

96.6 psi, 13,900 psf

108.1 psi, 15,600 psf


Confined values are what the foam does once it is compacted against soil and the underside of a slab, which is why they run well above the free-rise figures. The data sheet labels these levels 1.5x, 2x and 3x without stating what the multiplier is measured against, so confirm the basis with Technical Services before using them in a submittal.


Reaction profile at 105°F

Stage

Time

Method

Cream time

2 seconds

ASTM D7487

Tack-free time

22 seconds

ASTM D7487

Rise time

27 seconds

ASTM D7487


Liquid components

Property

A side

B side

Specific gravity

1.23

1.03

Weight per gallon

10.25 lb

8.58 lb

Viscosity at 110°F

200 cP (200 mPa·s), ASTM D4878

Mix ratio

1:1, per the certified product listing. The listing does not state the basis


Equipment settings, not ambient air temperature

Setting

Temperature

Note

A-side material heater

100°F (38°C)

Machine setting

B-side material heater

110°F (43°C)

Machine setting

Hose

105°F (41°C)

Machine setting


Handling & certification

Property

Value

Method / Note

Composition

Two component structural polyurethane foam, heated and mixed at the gun

TDS

Storage temperature

50 to 80°F (10 to 26°C)

TDS

Shelf life

24 months in unopened containers stored within the range above

TDS

Packaging

100-gallon and 500-gallon units, each a matched A-side and B-side pair

Product page

Certification

NSF/ANSI/CAN 61 and 372. Certified for contact with drinking water, with limits on tank volume and on wetted surface area relative to volume, a cure condition before contact, and not intended for pipe application. Read the certificate for the conditions of the listing.

Certified product listing, issued 08/20/2024

AP Lift 440 is a 4 lb foam. Density is how these foams are graded, so a 3 lb, a 4 lb and a 6 lb foam are different products for different loads, and the range above is the manufacturing tolerance on that grade, not a choice. Free-rise values are unconfined laboratory figures; confined beneath a slab the foam reaches a higher density and higher strength, which is what the confined table shows. Temperatures in the equipment table are material temperatures at the machine, not air temperature limits for the job site, and no ambient application range is published for this product. Source: AP Lift 440 Technical Data Sheet, Rev. 1/20/2026, except where the Note column says otherwise. Properties vary with site conditions; confirm against the current data sheet before specifying.

Downloads

Data sheets, specifications, procedures, and certificates

Assembling a submittal package or comparing products? Every TDS, SDS, spec, and certificate lives in the central Downloads library.

Compatible equipment & accessories

What you need to install AP Lift 440

  • Two-component proportioner with material heaters, required. AP Lift 440 cannot be poured or hand mixed. View proportioners 

  • MixMaster Pro slab lifting gun, the gun named in the CSI 31 43 00 specification. View gun 

  • PX-7 slab lifting gun, the alternate gun option. View gun 

  • 3/8 inch hammer-in injection ports, named in the CSI 31 43 00 specification. View ports 

  • Alchatek Surface Guard 125, protects finished surfaces during injection. View accessory 

  • Alchatek Pump Flush, reusable, biodegradable pump flush for shutdown. View flush 

  • Alchatek Soak 130, cured-polyurethane cleaning solvent. View solvent 

Related articles & guides

Learn the method behind the product

Frequently Asked Questions

Lifting and leveling concrete slabs that carry traffic and heavy loads, filling voids and annular spaces, densifying and stabilizing weak soil, and supplemental sinkhole remediation. It is the DOT and highway grade of the AP Lift line.

Density, and therefore load. AP Lift 430 is a 3 lb foam at 50 psi free-rise compressive strength, for residential and light commercial slabs. AP Lift 440 is a 4 lb foam at 80 psi, for slabs carrying traffic and heavier loads. The heavier grade expands less, 18 times against 25, so it takes more material to fill the same void.

It is a 4 lb foam. Published free-rise values are 80 psi compressive strength, or 11,500 psf, 90 psi tensile strength, or 13,000 psf, and 40 psi shear strength, or 5,760 psf, at a nominal cured density of 4 pounds per cubic foot. Flexural strength is 130 psi and the foam is 85.2 percent closed cell. Confined beneath a slab the foam reaches a higher density and higher strength than these free-rise figures.

They are compressive and shear values measured at three levels of confinement, labelled 1.5x, 2x and 3x on the data sheet, running from 165.3 psi compressive at 1.5x up to 216.1 psi at 3x. The data sheet does not define what the multiplier is measured against, so confirm the basis with Technical Services before using these values in a submittal.

The technical data sheet publishes an unconfined expansion of 18 times its liquid volume, against 25 times for the 3 lb grades in the line. Unconfined is a laboratory free-rise figure. Under a slab the foam is confined, so real expansion is lower and the resulting density is higher. Plan material quantities from the grade you are actually specifying.

The data sheet publishes 90 percent of full strength in about 15 minutes, which is why slab lifting is generally described as same-day work rather than a multi-day cure. Confirm return to service for your loading and conditions with Technical Services.

Both. The foam expands into voids and weak ground beneath the slab, compresses and densifies that soil as it expands, then cures into a closed-cell structural mass that carries load. Lifting the slab without addressing the ground beneath it is what lets a slab settle again.

The data sheet lists supplemental sinkhole remediation, and the word supplemental is doing real work in that phrase. The foam fills voids and densifies loose ground as part of a remediation designed by an engineer who has characterised the sinkhole. It is not a stand-alone sinkhole repair. Bring Technical Services into the design early.

A two-component proportioner with material heaters, plus a slab lifting gun. This is not a product that can be poured or hand mixed. The two sides are heated, metered, and mixed at the gun, then injected through small ports drilled in the slab.

The reaction is temperature dependent. The data sheet gives equipment settings of 100 degrees F on the A side, 110 degrees F on the B side, and 105 degrees F at the hose. Those are material temperatures at the machine, not air temperature limits for the job site.

AP Lift 440 is certified to NSF/ANSI/CAN 61 and 372. The listing carries use restrictions, including limits on tank volume and on wetted surface area relative to volume, and it is not intended for pipe application. Read the certificate for the full conditions and confirm the listing is current before specifying.

The data sheet publishes a shelf life of 24 months in unopened containers stored between 50 and 80 degrees F. Both sides should be kept sealed and within that range.

Yes. Alchatek publishes a CSI Section 31 43 00 specification, Concrete Raising and Void Filling, written around AP Lift 440 and its accessories. It is in the downloads on this page, along with the slab lift and deep injection field procedures.

100-gallon and 500-gallon units. Each unit is a matched pair of A-side and B-side containers.

Proof & Verification

APLIFT440-PB-01

DOT Culvert Void Fill

A Utah-based geotech specialist partnered with a general contractor to address a critical DOT infrastructure challenge involving the replacement of an existing culvert on a major roadway in Utah.
View case study

APLIFT440-PB-02

Slot 2: Performance Data Point or Credential

empty, Alchatek to supply
Case Studies

APLIFT440-PB-03

Slot 3: Documentation Reference

empty, Alchatek to supply
Case Studies

Roadway, ramp, or approach slab that has to carry traffic again the same day? Talk the grade, the lift, and the ground through together before the ports go in.

For documentation, see the data sheets above or reach Technical Services. To purchase, find an authorized distributor or a qualified contractor.