Public park waterfront staircase, New York

Waterfront Staircase
Stabilization

A New York City park's eroding beachfront staircase, built over landfill, was stabilized with polyurethane injection in under two weeks, at an estimated 97% lower cost than heavy reconstruction and without closing the park.

Estimated cost savings
97percent
Completed in
<2weeks
Products
AP Fill 720
AP Lift 430
Download as PDF
I · The Problem
Case Study  ·  01
01

What made this job
difficult.

Public park waterfront
New York

A public park in New York had critical erosion issues at its waterfront staircase and adjacent beach, which were built over a landfill. Over the years, natural erosion pulled back sand, exposing uneven foundation areas and creating safety hazards for visitors.

The partially buried concrete staircase showed significant subsidence and shifting soil, posing a risk of structural collapse. The New York City Parks Department needed a rapid solution to stabilize the site before further degradation occurred.

Key Condition
Voids beneath the stairs and along the beachfront, with sand migration making the instability worse.
The Constraint
No room to excavate.
Limited access, adjacent structures
Traditional excavation or pier-and-casing methods were impractical due to limited access and the need to avoid displacing adjacent structures.
At a Glance
97%
Estimated cost savings vs. heavy reconstruction
<2weeks
Time to complete the work
6–8feet
AP Fill 720 injection depth, every 4 feet
~1gal/ft
AP Lift 430 beneath the staircase
II · The Solution
Case Study  ·  02
02

What was specified,
and how it went in.

AP Fill 720
AP Lift 430

Technicians found differential settlement in the staircase and surrounding sand, likely caused by uneven soil compaction and erosion. The team selected two materials: AP Fill 720 for soil compaction and stabilization, and AP Lift 430 for structural void filling.

AP Fill 720 addressed the loose sand through permeation and consolidation, while AP Lift 430 filled the critical voids beneath the staircase, providing lift and support.

The Materials
AP Fill 720
Single-component polyurethane
AP Lift 430
Two-component structural foam
The Method
01
Stabilize
Inject AP Fill 720 every 4 feet at 6 to 8 feet deep to bond sand particles and prevent further migration.
02
Fill voids
Inject AP Lift 430 directly beneath the staircase's granite slabs through strategic ports, about 1 gallon per linear foot.
03
Seal
Use the reserved AP Fill 720 to seal surface gaps around the staircase and prevent sand washout.
III · The Proof
Case Study  ·  03
03

What the result was,
and what confirmed it.

Post-repair inspections

The dual-material injection rapidly stabilized the waterfront staircase, eliminating soil migration and structural risk without closing the park. Compared to traditional heavy reconstruction, the approach cut costs by an estimated 97% and finished in under two weeks with minimal marine or community disruption. Post-repair inspections confirmed lasting results with no recurrence of erosion.

Estimated cost savings
97percent
Park open throughout. No recurrence of erosion.
Start the Conversation
Send us the job.
We will send back an approach.

Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.

Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.