I · The Problem
Case Study  ·  01
01

What made this job
difficult.

City Creek Center shopping mall
Salt Lake City, Utah

While under construction a five-foot-wide trench, located between two underground parking garages, was back-filled with pea gravel, and then a sidewalk was built on top of it. About ten years later the gravel began to settle enough to cause underground power lines to stretch and finally tear, knocking the power out for many of the local businesses. Engineers determined that the trench could be stabilized with the installation of polyurethane grout at depths of 30 feet below the surface. A local geotechnical services contractor was called in to perform the work.

The Constraint
5feet
trench width
At a Glance
10tubes
injection tubes
installed 30 feet deep into the soil
1gallon per vertical foot
material rate
AP Fill 700 pumped as tubes were pulled up
36inches
injection point spacing
2days
site work duration
II · The Solution
Case Study  ·  02
02

What was specified,
and how it went in.

AP Fill 700

AP Fill 700 is a single component, water-activated, hydrophobic, low viscosity, closed-cell polyurethane injection resin.

The Material
AP Fill 700
AP Fill 700
Tensile Strength 45 psi (3,102 mb); Tensile Elongation 2.9%; Shrinkage Negligible; Compressive Strength (with fine sand) 2,050 psi (141,343 mb); Pre-activated mix viscosity 110-130 cP.
The Method
01
Plan
An Alchatek technical consultant worked closely with the geotech contractor to develop the injection plan, detailing exactly where each of the injection points would be located.
02
Approve
The plan was communicated to the engineer and approval was given to move forward with the project.
03
Install
The geotech crew installed 10 injection tubes 30 feet deep into the soil, spaced about 36 inches apart.
04
Inject
They pumped approximately 1 gallon per vertical foot of AP Fill 700 as they pulled the tubes up 1 foot at a time.
The Stakes
Settling gravel stretched and tore underground power lines, knocking out power for many local businesses.
The trench sat between two underground parking garages, beneath a sidewalk built on top of the pea gravel backfill.
Planned With Alchatek
An Alchatek technical consultant developed the injection plan with the geotech contractor, and the engineer approved it.
III · The Proof
Case Study  ·  03
03

What the result was,
and what confirmed it.

completion time

After only two days the site work was completed, and the general contractor was able to move forward with filling the trench and repairing the sidewalk.

completion time
2days
Site work complete, clearing the way for trench fill and sidewalk repair.
30 Feet Deep
Engineers determined the trench could be stabilized with polyurethane grout at depths of 30 feet below the surface.
Ten injection tubes, about 36 inches apart, with roughly 1 gallon of AP Fill 700 per vertical foot.
A Decade in the Making
About ten years after construction, the pea gravel backfill began to settle beneath the sidewalk.
Start the Conversation
Send us the job.
We will send back an approach.

Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.