Back to Case Studies

Power Plant Intake Well Curtain Grouting Austin

Project photo: Curtain Grouting in a Repurposed Power Plant Intake Well
Alchatek
Case StudyLeak Seal
Seaholm Waterfront intake building Austin, TX

Curtain Grouting in a
Repurposed Power Plant Intake Well

Sealing leaking intake chambers thirty feet below grade in the repurposed Seaholm Power Plant intake building.

Job completed
1week
Product
Spetec HighFoamer
Download as PDF
I · The Problem
Case Study  ·  01
01

What made this job
difficult.

Seaholm Waterfront intake building
Austin, TX

The intake building renovation project hit a snag when they discovered that several thousand gallons of water were pouring into the chambers on a daily basis. Initially, concrete was poured into the chambers to stop the leak. This proved to be ineffective and further complicated the job.

Preventing the free-flowing entry of lake water into the building is central to the scope of this project improving the occupancy conditions by lowering humidity levels, eliminating odors and pests, and preserving the integrity of the building materials.

Key Condition
High-pressure leaks entering chambers thirty feet below grade through concrete previously and ineffectively patched with poured concrete.
The Constraint
9 of 10wells
Successfully sealed off
One well required additional work by the underwater construction crew.
At a Glance
1.25in
Injection hole diameter
4-7ft
Hole depth through concrete
5holes
Injection points
II · The Solution
Case Study  ·  02
02

What was specified,
and how it went in.

Spetec HighFoamer

Specialty contractors Canalco were brought in to seal the leaks via polyurethane curtain grouting, in which the technicians drill holes through concrete and inject water-activated grout on the other side, stopping the leak at its source. Technical assistance was provided by Chamberlin Waterproofing.

The Material
Spetec HighFoamer
Water-activated polyurethane grout
The engineering firm Wiss, Janney, Elstner Associates, Inc., specified Spetec HighFoamer as the best grout to handle these high-pressure leaks.
The Method
01
Enter
A confined entry certified technician was sent deep into the well.
02
Drill
Drilled 1.25" injection holes 4-7 feet through the concrete.
03
Inject
Injected Spetec HighFoamer through five holes to create a grout curtain on the outside of the structure to seal off the leaks.
Stopped at the Source
Curtain grouting stops the leak at its source, with water-activated grout injected on the other side of the concrete.
Wiss, Janney, Elstner Associates specified Spetec HighFoamer as the best grout to handle these high-pressure leaks.
III · The Proof
Case Study  ·  03
03

What the result was,
and what confirmed it.

Completion time
April 21, 2021

The job was completed in just one week. The city continues to monitor the situation and the results have been spectacular given the difficulty of the job and the complications.

Completion time
1week
The city continues to monitor the results.
Why It Mattered
Keeping lake water out lowers humidity, eliminates odors and pests, and preserves the building materials.
Several thousand gallons of water had been pouring into the chambers every day.
9 of 10 Wells Sealed
One well required additional work by the underwater construction crew.
Start the Conversation
Send us the job.
We will send back an approach.

Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.

Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.