A critical safety issue arose at a large paper manufacturing plant when large voids were discovered beneath concrete slabs supporting heavy water pumps.

Void Depth
18inches
Product
AP Lift 475
Download as PDF
I · The Problem
Case Study  ·  01
01

What made this job
difficult.

Paper manufacturing plant

Large voids up to 18 inches deep were discovered beneath concrete slabs supporting heavy water pumps. This hazardous condition put both employees and equipment at risk. A geotech specialist was called in to fill the voids and secure the slabs.

Key Condition
Voids up to 18 inches deep beneath concrete slabs supporting heavy water pumps.
The Constraint
18inches
Void Depth
At a Glance
100p.s.i.
Compressive Strength
ASTM D-1621
100p.s.i.
Tensile Strength
ASTM D-638
14-16times
Expansion (Unconfined)
4.5 to 5.0lb/ft3
Density
ASTM D-1622
Eliminating the dangerous voids created a safer work environment.
II · The Solution
Case Study  ·  02
02

What was specified,
and how it went in.

AP Lift 475

The technicians chose AP Lift 475 for the job. This material offers strong load-bearing capacity and cures quickly, minimizing plant downtime.

The Material
AP Lift 475
AP Lift 475
Strong load-bearing capacity and fast curing, allowing a swift return to full operation.
The Method
01
Drill
3/4-inch holes drilled roughly every 3 feet across the affected area.
02
Inject
Repair material injected into each hole.
03
Flow
Substance flowed beneath the slab from one drilled hole to the next, providing comprehensive coverage.
III · The Proof
Case Study  ·  03
03

What the result was,
and what confirmed it.

Completion Time

The entire repair took only one day to complete. After the work, the slabs were securely stabilized, and the pump equipment and workers were safe. The paper manufacturing company expressed satisfaction with the outcome.

Completion Time
1day
Due to the quick turnaround time, minimal disruption occurred. Eliminating the dangerous voids created a safer work environment.
Start the Conversation
Send us the job.
We will send back an approach.

Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.

Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.