Soverel Harbour Marina
Seawall and Walkway Stabilization
Underwater erosion and soil loss beneath a 2,700-linear-foot marina's seawall and walkway required a phased polyurethane injection repair while the site remained fully operational.
What made this job
difficult.
Palm Beach Gardens, Florida
Soverel Harbour Marina had significant underwater erosion and soil loss beneath its seawall and walkway. This repair project was initiated due to severe underwater erosion, verified by divers, which threatened nearby structures.
The team faced unique challenges, including working around luxury yachts without disruption, managing potential material travel in the water, and mitigating settlement issues in pavers.
What was specified,
and how it went in.
To address these issues, the team proposed a phased injection approach using AP Fill 720 single-component polyurethane. This solution aimed to stabilize the soil, prevent further erosion, and maintain marina functionality while working around luxury yachts.
What the result was,
and what confirmed it.
The project began with an initial 250-foot test section, which was completed successfully using 830 gallons of AP Fill 720. After 18 months of monitoring with no reported issues, the contractor received approval to treat the remaining sections of the marina. To date, 1,000 feet have been completed, with plans underway to complete the remaining section.
We will send back an approach.
Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.
Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.
Information in this document is believed accurate at the date of publication. Product performance depends on site conditions and application; consult the current Technical Data Sheet, which is the controlling document.