concrete seawall built in 1901 Poulsbo, Washington

Poulsbo Historic
Seawall Restoration

A historic waterfront residence in Poulsbo, Washington, required soil stabilization behind a 135-foot-long concrete seawall built in 1901.

seawall length
135ft
Product
AP Fill 720
Download as PDF
I · The Problem
Case Study  ·  01
01

What made this job
difficult.

concrete seawall built in 1901
Poulsbo, Washington

Engineering evaluation documented vertical cracks along the seawall without structural offset, but revealed substantial voids behind the wall. The erosion hazard area designation and 100-year floodplain location required engineered solutions to prevent continued property loss.

Key Condition
Voids behind the seawall indicating ongoing soil loss, located in an erosion hazard area and 100-year floodplain.
The Constraint
5ft
wall height
At a Glance
26locations
injection points
at 5-ft intervals along the 135-ft seawall
170gallons
AP Fill 720 resin injected
6.5ft
access hole depth
30filters
pressure control filters installed
with geotextile filtration media
II · The Solution
Case Study  ·  02
02

What was specified,
and how it went in.

AP Fill 720

The design specified expansive polyurethane injection to fill voids and bind soil particles. AP Fill 720 was selected for its rapid-setting properties and resistance to water infiltration. The system included 2.5-inch filter drainage ports spaced 5 feet apart to relieve hydrostatic pressure.

The Material
AP Fill 720
AP Fill 720
Expansive polyurethane injection resin used to fill voids and bind soil particles.
The Method
01
Established
26 injection locations at 5-ft intervals along the 135-ft seawall.
02
Injected
approximately 170 gallons of AP Fill 720 resin using controlled techniques.
03
Drilled
access holes to 6.5-ft depth behind the structure.
04
Installed
30 pressure control filters with geotextile filtration media.
III · The Proof
Case Study  ·  03
03

What the result was,
and what confirmed it.

cost savings

The three-day stabilization project addressed soil loss while preserving the historic structure. Post-construction monitoring confirmed successful void filling throughout the treatment area. A cost analysis demonstrated approximately 70-80% savings compared to complete reconstruction, while extending the existing structure's service life by decades and reducing construction duration compared to traditional methods.

cost savings
70-80%
compared to complete reconstruction
Start the Conversation
Send us the job.
We will send back an approach.

Contact Us Today