Sealing Leaks in a
Cooling Tower Lift Station
A cooling tower lift station under construction in Iuka, Mississippi, had a significant water leak problem.
What made this job
difficult.
Iuka, Mississippi
A cooling tower lift station under construction in Iuka, Mississippi, had a significant water leak problem. The facility was losing approximately 1,000 gallons of water daily. The source and destination of the leak were unknown. A solution was implemented using concrete sealing techniques. Leak seal experts were called in to perform the repairs.
What was specified,
and how it went in.
The technicians chose Spetec F400 for the repair. This polyurethane-based material has a closed-cell structure that seals cracks and joints. It remains flexible after curing, which allows for structural shifts. The material is NSF-certified, meeting environmental standards for water-related applications.
What the result was,
and what confirmed it.
The crew only took about 3 hours to completely seal all of the leaks and return the manhole to service. There was no way the leaks could have been left un-repaired due to the water treatment cost and the potential damage the erosion would have caused. Replacing the manhole would have easily cost three or more times the price of grouting. In this case, the community wins as many tax dollars are being saved.
We will send back an approach.
Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.
Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.
Information in this document is believed accurate at the date of publication. Product performance depends on site conditions and application; consult the current Technical Data Sheet, which is the controlling document.