CVS Pharmacy
Soil Stabilization
Developers working on a new CVS Pharmacy in Orlando, Florida, encountered critical soil stability issues during the construction process.
What made this job
difficult.
Orlando, Florida
Developers working on a new CVS Pharmacy in Orlando, Florida, encountered critical soil stability issues during the construction process. The project managers faced a significant challenge when geotechnical testing revealed unsuitable soil conditions between 5 and 10 feet below the surface, posing a threat to the structural integrity of the planned parking lot. This issue was discovered after site preparation had already begun, adding urgency to finding an effective solution that would allow construction to proceed on schedule.
What was specified,
and how it went in.
two-component polyurethane foam
A comprehensive soil stabilization plan utilizing AP Lift 475, a two-component polyurethane foam, was proposed. This solution was chosen for its ability to consolidate soil throughout the parking lot area, provide a stable foundation for the structure, and avoid extensive excavation and soil replacement.
What the result was,
and what confirmed it.
The polyurethane injection solution proved highly effective, successfully stabilizing the soil without the need for extensive excavation. This approach allowed the construction schedule to be maintained, avoiding costly delays that would have been incurred with traditional soil replacement methods. Post-injection testing confirmed that the treated area passed all required stability tests, demonstrating the effectiveness of polyurethane injection for large-scale soil stabilization projects in commercial construction.
We will send back an approach.
Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.
Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.
Information in this document is believed accurate at the date of publication. Product performance depends on site conditions and application; consult the current Technical Data Sheet, which is the controlling document.