Bridge Approach Slab
Leveling
A settled bridge approach slab on a busy San Francisco roadway was stabilized and releveled using Deep Lock® soil stabilization and AP Lift 475 instead of full replacement.
What made this job
difficult.
San Francisco, California
A critical infrastructure issue emerged on a four-lane road near downtown San Francisco. Soil erosion caused a bridge approach slab to settle 2.5 to 3 inches over time. The affected area had an asphalt surface with a thin sleeper slab underneath. California Department of Transportation (Caltrans) engineers initially advocated for complete replacement.
Full replacement would have required closing the entire roadway and replacing a 40x12 foot area of asphalt and sleeper slab.
What was specified,
and how it went in.
Bay Area Underpinning and Alchatek proposed an alternative: Deep Lock® soil stabilization and concrete leveling. DOT engineers approved the approach to reduce traffic disruption and cut costs compared to full replacement.
What the result was,
and what confirmed it.
The modular repair approach minimized traffic disruption on this busy thoroughfare. Only two of four lanes closed at any time, so traffic continued to flow. Compared to full replacement, the method cut labor, disruption, and cost.
We will send back an approach.
Request a free site consultation and specification review for your next slab leveling or soil stabilization project.
Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.
Information in this document is believed accurate at the date of publication. Product performance depends on site conditions and application; consult the current Technical Data Sheet, which is the controlling document.