How Atlas Structural Expanded from Limited Commercial Work to Large-Scale Grout Projects

larger than anything they had done before
5x
Product
AP Lift 475
Download as PDF
I · The Problem
Case Study  ·  01
01

What made this job
difficult.

bridge

Atlas Structural already had a strong, stable business. They were experienced, capable, and consistently performing excellent residential work and some commercial work. But they had a plan to expand into large-scale projects in a big way. This meant taking on more complex scopes, positioning for larger, higher-margin projects, and competing in a more demanding environment. The limitation wasn't demand; the opportunity for larger commercial work was already there. Larger commercial projects require advanced project evaluation, expert technical positioning, and the ability to clearly demonstrate scope and risk. Atlas recognized that competing at this level meant refining how they assessed, presented, and positioned their work.

The Constraint
Not demand
The opportunity for larger commercial work was already there.
The Plan
Take on more complex scopes, position for larger, higher-margin projects, and compete in a more demanding environment.
II · The Solution
Case Study  ·  02
02

What was specified,
and how it went in.

AP Lift 475

Through Alchatek support, Atlas Structural was introduced to new application capabilities and tools. They received application and product training, guidance on expanding into new types of work, and hands-on experience using the Pagani DCP. More importantly, they learned how to use the DCP not just as a testing tool, but as a sales tool. This allowed them to better diagnose site conditions, clearly communicate problems to customers, and justify larger, more complex solutions. On the bridge project that followed, AP Lift 475 was the featured product.

The Material
AP Lift 475
Featured product
Used on the bridge project, the largest chemical grout project in Atlas Structural's history.
The Method
01
Trained
Received application and product training.
02
Guided
Received guidance on expanding into new types of work.
03
Practiced
Gained hands-on experience using the Pagani DCP.
04
Repositioned
Learned to use the DCP not just as a testing tool, but as a sales tool.
III · The Proof
Case Study  ·  03
03

What the result was,
and what confirmed it.

largest chemical grout project in company history

The results were immediate and significant. Atlas Structural secured a bridge project that became the largest chemical grout project in their company's history, 5x larger than anything they had done before. This wasn't incremental growth; it was a step change in the scale of work they could pursue and win.

largest chemical grout project in company history
5x
5x larger than anything they had done before.
Start the Conversation
Send us the job.
We will send back an approach.

Send us the soil report or the failure photos and Technical Services will return a written approach within two business days.

Alchatek manufactures polyurethane resins, chemical grouts, and injection equipment for infrastructure repair: leak sealing, soil stabilization, concrete lifting, and seawall repair. Headquarters in Tucker, Georgia, with a bonded warehouse in Reno, Nevada.